Uncompensated scope changes
You build the change without claiming it. Your profit margin absorbs the cost. On a typical project, this can mean thousands in lost revenue per undetected variation.
Time-barred variation claims
Most construction contracts require variation notices within strict timeframes. If you don’t detect the change in time, you lose the right to claim—regardless of merit.
Procurement to the wrong revision
Materials ordered against the old drawing arrive wrong. Returns, re-orders, and storage fees compound the loss and push your programme out.
Manual comparison takes too long
You’re trusting a 10-minute manual scan to catch changes that affect your profit margin. On a drawing set of 14+ sheets, subtle changes are invisible to the naked eye.